MTC Milaor Solar Plant

Managing a project
Designing a solar panel system

LOCATION; Milaor, Camarines Sur

CAPACITY: 128.7 kWp / 100 kWp On-Grid System

TESTING DATE: December 29, 2021

TESTING DATE (REROOFING): January 26, 2024


This is our first solar plant project that breached the three-digit capacity way back in December 2021.


This is also our first time to install rapid shutdown devices. Rapid shutdown devices or RSD are devices designed to cut-off the solar panels from the system when there is a fire breakout in the area.


This is our first solar plant project that is three-phase. Single phase and three-phase differ in how they distribute power in the property, especially if there are loads with three-phase power.


This is also the first project to change their roof. We uninstalled the panels, wait for the replacement roof to finish installation, then reinstall the panels in the new roof.


Pic: Marketing for MTC Milaor Solar Plant

Pic: Bird's Eye View of PV Layout

Pic: MTC Compound w/ Solar Plant

Pic: Inverter Station

Pic: My picture with the panels

Pic: Picture of the co-owners of Billbreaker Solar