LOCATION; Milaor, Camarines Sur
CAPACITY: 128.7 kWp / 100 kWp On-Grid System
TESTING DATE: December 29, 2021
TESTING DATE (REROOFING): January 26, 2024
This is our first solar plant project that breached the three-digit capacity way back in December 2021.
This is also our first time to install rapid shutdown devices. Rapid shutdown devices or RSD are devices designed to cut-off the solar panels from the system when there is a fire breakout in the area.
This is our first solar plant project that is three-phase. Single phase and three-phase differ in how they distribute power in the property, especially if there are loads with three-phase power.
This is also the first project to change their roof. We uninstalled the panels, wait for the replacement roof to finish installation, then reinstall the panels in the new roof.
Pic: Marketing for MTC Milaor Solar Plant
Pic: Bird's Eye View of PV Layout
Pic: MTC Compound w/ Solar Plant
Pic: Inverter Station
Pic: My picture with the panels
Pic: Picture of the co-owners of Billbreaker Solar